Multi-Team Construction and Workshop Mode

Team-owned Construction lets several human teams build different Units from one approved intent. Workshop mode is one application of the same mechanism; the engine contract is scope-agnostic:

  • Construction Iteration: unit-major
  • Unit Ownership: team
  • a valid Unit dependency DAG
  • a shared git namespace, or sibling worktrees sharing one local ref database

Team ownership currently requires the workspace root itself to be the source Git repository. An intent with a recorded sibling-repo set is rejected before Unit Ownership: team is recorded; use solo ownership for that multi-repo intent.

The integration lead works from unscoped main. Each delivery team works from a checkout stamped to one claimed Unit. A claimed checkout runs that Unit's exact Construction chain, stages 3.1 through 3.5, in graph order. Main never reruns those stages after merge because the team's keyed receipts arrive with its audit shard.

For the Workshop scope's stage grid and Minimal test floor, see Scopes and Depth.


Roles and topologies

Role Responsibility
Integration lead Drives Inception and any required walking skeleton on main, monitors claims, pins completed candidates, presents merge gates, and lands approved Units
Unit team Claims one dependency-ready Unit, runs its scoped 3.1-3.5 chain, commits the artifacts/receipts/source, and publishes the candidate
Review group Answers the Unit's selected team gates and the main-side pinned merge gate

Two topologies use the same commands and evidence:

Command examples use the harness-neutral public grammar. Run them through the installed harness's /aidlc command surface or its packaged aidlc dispatcher; no example assumes a .claude/, .kiro/, or .codex/ tool path.

Clone per team

Each team clones the shared remote. Claim coordination and candidate publication use refs/heads/claim/<intent-id8>/<unit>.

git clone <shared-remote> payments-team
cd payments-team
git fetch --all
aidlc unit claim payments --team "Payments team"

Sibling worktrees

One repository creates sibling worktrees. Claims use the shared local branch namespace through atomic git update-ref only when no remote is configured. If origin exists, sibling worktrees use the same remote-backed claims as separate clones. This topology is useful for one machine and deterministic tests; remove the remote only when the whole exercise is intentionally local/offline.

# From unscoped main:
# Optional local-only mode: git remote remove origin
aidlc worktree create --slug payments --base main
cd .aidlc/worktrees/bolt-payments
aidlc unit claim payments --team "Payments team"

Run the same scoped build and publish commands below from that worktree. After main lands and pushes the candidate, return to main and discard the completed local worktree with aidlc worktree discard --slug payments.

Normal scoped next, lifecycle, review, and gate work is offline-first. Network access is confined to explicit claim, publish, status, pin, and merge-ref verification operations.


Prepare Construction

The integration lead completes Inception, including:

  1. the authoritative Unit DAG;
  2. Construction Iteration: unit-major;
  3. Unit Ownership: team;
  4. the team gate rhythm, per-stage or unit-end;
  5. the affirmed branching strategy.

When the scope records skeleton: on, the first DAG Unit is the walking skeleton. It runs on unscoped main before claims open and needs no merge-back gate. With skeleton: off, dependency-ready Units open immediately.

Publish the approved Inception state and artifacts before teams claim:

git push origin main

Claims open by dependency batch. "Delivery planning is complete" does not mean every Unit is claimable; a Unit remains blocked until every depends_on row is merged.


Claim, build, and publish

1. Claim

In a participant clone:

git fetch --all
aidlc unit participate

Run /aidlc for the guided picker, or claim directly:

aidlc unit claim payments --team "Payments team"

Exactly one concurrent claimant wins. The command stamps the checkout with space, intent, Unit, generation, nonce, and gate rhythm.

To hand the same attempt to a teammate on another machine, push the claim ref. The teammate fetches and checks out the exact local claim/<intent-id8>/<unit> branch, then runs:

aidlc unit adopt payments

Adoption verifies the checked-out payload against the live ref and keeps the claim's bound audit shard, so the teammate can resume and publish without creating a successor attempt.

2. Build

Run /aidlc in the claimed checkout. The engine routes only the stamped Unit:

  1. Functional Design (3.1)
  2. NFR Requirements (3.2)
  3. NFR Design (3.3)
  4. Infrastructure Design (3.4)
  5. Code Generation (3.5)

Plan Approval remains mandatory during Code Generation.

Gate rhythm controls the team review points:

  • per-stage: one gate after each settled (stage, Unit);
  • unit-end: one team completion gate after 3.5;
  • both rhythms still add one pinned merge gate on main.

Commit the completed artifacts, source, state mirror, and audit shard. Publication requires a clean tracked checkout:

git add -A
git commit -m "Complete payments Unit"
aidlc unit publish payments

publish creates a candidate commit whose tree is the team's committed work and whose parents bind both the claim history and the implementation history. It CAS-updates the claim ref. Publication is not integration.


Pin, gate, and land

All merge commands run from unscoped main.

1. Pin the candidate

git fetch --all
aidlc unit pin payments

Pinning records one exact candidate OID and attempt generation. Evidence is read with git object plumbing, not by merging or creating a worktree:

  • required Unit artifacts;
  • UNIT_COMPLETED receipts for active stages;
  • team gate approvals at the claim rhythm;
  • required reviewer READY verdicts;
  • Plan Approval fingerprint and explicit approval;
  • the candidate state row;
  • the transportable team audit shard.

Trust model. The claim-bound team shard may carry that team's own attempt-keyed UNIT_COMPLETED, team-gate, and reviewer receipts. Those rows are team assertions: pin re-verifies required artifacts and fingerprints, and the human reviews the remaining trust at the pinned merge gate. A team shard may never carry HUMAN_TURN, MERGE_DISPATCH_*, UNIT_MERGED, a unit-merge gate, another Unit's receipt, or another/new audit shard. Pin and land also refuse workflow-record changes outside the claimed Unit subtree. Product-source paths outside the Unit's record tree remain visible in the gate evidence for human overlap judgment.

If the claim is released/re-claimed, or the ref moves after pinning, the gate and landing commands refuse. Run pin again and review the new OID explicitly. If the registry cannot be reached, gate and land fail closed because they cannot prove the pin was not tombstoned.

2. Present the merge gate

Before the gate, the harness follows the existing merge-dispatch seam: it emits MERGE_DISPATCH_INVOKED, asks the pipeline-deploy agent to resolve the affirmed target/strategy from the active practices, then emits MERGE_DISPATCH_RETURNED or MERGE_DISPATCH_FALLBACK. The pinned OID and Unit attempt generation and pin transaction ID are passed to every dispatch-event call through --pinned-oid, --attempt-generation, and --pin-id; the gate ignores unbound or older rows, including a bracket from an earlier pin of the same candidate. The gate is not presented until that bracket is complete. Pinned Unit landing requires strategy merge so the reviewed OID is a direct parent; a squash/rebase result is refused and must be reconciled before the gate.

The integration lead presents the evidence summary and pinned OID to the human, then records the exact answer:

aidlc unit gate payments \
  --decision approve \
  --user-input "Approve pinned candidate"

A rejection keeps the candidate unmerged. A candidate carrying Merge-Held: true is refused until the team resolves the HOLD-MERGE sequence, publishes again, and main re-pins.

3. Land

aidlc unit land payments --target main

Landing is ordered and resumable:

  1. Git content first. Re-fetch the integration branch and verify that the approved Unit DAG, Unit kind, active stage columns, and evidence are still current, then merge the pinned OID. Contract drift refuses before mutation and requires rebase, republish, re-pin, and a new merge gate. Main's aidlc-state.md, runtime graph, cursors, and engine markers are retained; the team's new audit shard and per-Unit artifacts/source land. Real source conflicts abort back to a clean checkout and list the files. A clean automatic merge of a shared file is also refused when its result differs from the pinned candidate; rebase and republish. No Unit row has been folded.
  2. State fold. Under the per-intent lock, derive the candidate's transported receipts, write the merged Unit row while preserving main's singletons and other rows, then emit UNIT_MERGED.
  3. Audit/finalize. Commit the main state and merge lifecycle rows, then mark the local transaction complete.

The steps can be driven separately for recovery:

aidlc unit land payments --step git
aidlc unit land payments --step state
aidlc unit land payments --step audit

Each step is idempotent. merge-status shows the local transaction:

aidlc unit merge-status payments

Push the landed target branch so other teams and future claim checks observe the new integration state:

git push origin main

Dependents become claimable from the merged row. After the last row merges, the per-Unit block settles and main routes Build and Test (3.6), then CI Pipeline (3.7), exactly as solo Construction does.


Dispatcher, status, and health checks

On unscoped main, /aidlc is a turn-terminal dispatcher while team fan-out is active. It renders one deterministic board verbatim:

  • Unit Progress, including owner, per-stage/gate cells, and merged state;
  • the local claim scan with owner, attempt generation, and observed ref activity (git refs carry no push timestamps);
  • pinned candidates awaiting a merge gate or landing recovery;
  • claimable Units and dependency-blocked Units.

Run /aidlc --status from main or any scoped checkout for the same board as a read-only snapshot. It performs no fetch and writes no state, cache, or audit row. Explicit space/intent selectors keep the status header, Unit DAG, claims, and merge journals on one identity. The board names the next claim, gate, or aidlc unit land recovery command. A participant with no currently claimable Unit receives this terminal board instead of falling into main's solo walk. Released claim history alone does not keep fan-out active: when no live claim and no incomplete merge transaction remains, main resumes the normal Construction walk.

When a fresh clone has several intents and no active-intent cursor, the picker annotates a mixed team workspace with statuses such as team construction, 2 units claimable, parked at code-generation, and complete. Single-intent and non-team picker text is unchanged.

/aidlc --doctor adds local-only claim reconciliation:

  • a released/superseded attempt whose checkout stamp still lingers is a fix-required stale-stamp finding;
  • a live claim with a known observation timestamp but no observed ref movement for 24 hours is an anomaly; release remains an explicit human decision;
  • a pre-upgrade cache with no observation timestamp receives a baseline advisory rather than a false inactivity finding;
  • claim refs whose intent id no longer exists locally are orphan findings.

Doctor never fetches or releases a claim.


Release, salvage, and resume

If a team cannot finish, the integration lead releases the claim from unscoped main:

aidlc unit release payments

Release publishes a generation-bumping tombstone. Old receipts remain history but cannot authorize a successor or merge. Preserve useful source/artifacts by cherry-picking or copying them into the successor's newly claimed checkout.

One narrow race has an explicit recovery. If the reviewed merge commit already landed locally (land --step git) and that exact attempt was then released, inspect the landed commit and record a human acknowledgment before folding:

aidlc unit land payments --accept-released-attempt \
  --user-input "I inspected the landed commit and accept completing this tombstoned attempt"

This is accepted only for the immediate tombstone whose predecessor is the pinned OID, before state folding, and never for a successor claim. The journal and main audit record the tombstone and acknowledgment.

After a prior release/re-claim, an intentional second release binds to the current nonce:

aidlc unit status
aidlc unit release payments --expect-nonce <nonce>

A claimed checkout resumes from its local stamp and disk evidence without network access. A fresh teammate checkout must use aidlc unit adopt <unit> once on the exact claim branch. Pull/fetch before claiming, adopting, publishing, or pinning; ordinary scoped /aidlc resume does not need the registry.


Two-day workshop walkthrough

Day 1

  1. The facilitator runs Inception with the group.
  2. If enabled, the facilitator builds and gates the walking skeleton on main.
  3. Alice claims billing; Bob claims notifications.
  4. Each team runs its scoped 3.1-3.5 chain and team gates.
  5. Each team commits and runs aidlc unit publish.

Day 2

  1. The facilitator pins Alice's candidate, reviews its evidence, records the merge gate, and lands it.
  2. Main is pushed; any Unit depending on billing becomes claimable.
  3. The facilitator repeats pin/gate/land for Bob's pinned candidate.
  4. When the final row is merged, /aidlc on main routes Build and Test, then CI Pipeline.
  5. The group reviews UNIT_MERGED, gate, reviewer, and merge-dispatch rows in the combined audit shards.

The teams never race to push main. Candidate refs can move only through claim-bound CAS publication; main serializes the reviewed pinned OIDs.